Fedex, GETAFE (MADRID)

LOGISTIC BUILDING REFURBISHMENT

  • Project complying with IATA regulations on air freight
  • Handling of goods and maneuvering of vans&trucks should be inside the warehouse
  • Reinforced air renewal&fire fighting equipment
  • Special docks & conveyors for Aerios Alum.containers were installed by CUBIC for handling.
  • Deadline: 5 months
  • Delivery: April 2012

TURNKEY REFURBISH

From Design (IDEAS CONTEST)to Turnkey construction (CPI)

  • Owner: Axa Reim
  • Architect: Soluciones Transparentes
  • 3.200 m²
  • 2014
Scroll up