Fedex, GETAFE (MADRID)
LOGISTIC BUILDING REFURBISHMENT
- Project complying with IATA regulations on air freight
- Handling of goods and maneuvering of vans&trucks should be inside the warehouse
- Reinforced air renewal&fire fighting equipment
- Special docks & conveyors for Aerios Alum.containers were installed by CUBIC for handling.
- Deadline: 5 months
- Delivery: April 2012
TURNKEY REFURBISH
From Design (IDEAS CONTEST)to Turnkey construction (CPI)
- Owner: Axa Reim
- Architect: Soluciones Transparentes
- 3.200 m²
- 2014