Amazon, COSLADA-MADRID

LAST MILE LOGISTIC BUILDING

  • G.L.A.: 12.000 M2
  • Canopy: 3.500 m²
  • Offices: 3.500 m²
  • Execution time: 7 months
  • Delivery: October, 2021

DESIGN & BUILD TURNKEY

    From Design to realitzation (CPI)

  • Owner: EQT EXETER
  • Architect: IDP
  • Monitor: Hill
  • 17.000 m²
  • 2021