SCANNELL, Alovera – Guadalajara

LOGISTIC BUILDING

  • GLA Warehouse: 11.900 m2
  • Offices: 300 m2
  • High Hazard Fire fighting equipmt.
  • Execution time: 8 months
  • Delivery: March 2023

DESIGN & BUILD TURNKEY CONSTRUCTION

From design to achievement

  • OWNER: SCANELL
  • Engineering: IDP
  • 12.200 m2
  • IN PROGRESS
Scroll up