Novocer, VALENCIA

HIGH ROTATION WAREHOUSE

  • 1 conventional cell: 9.800 m²
  • Refurbishment of existing cell: 5.800 m²
  • Precast piles 23m deep
  • 60cm thick slab for heavy loads (12T on plate)
  • TR34 superflat slab
  • Total area treated: 15.600 m²
  • Deadline: Phase 1 / 6 months
  • Delivery: September 2010

TURNKEY OPERATION

From Design (CEP) to Completion (CPI)

  • Owner: Novocer
  • Architect: Armengot Falco Engineering
  • 15.600 m²
  • 2010