FEDEX, C.L.A. – Madrid
LOGISTIC BUILDING REFURBISHMENT
- Project complying with IATA regulations on air freight: handling of goods and maneuvering of vans&trucks should be inside the warehouse: Reinforced air renewal&fire fighting equipment.
- Special docks & conveyors for Aerios Alum. containers were installed by CUBIC for handling.
- Deadline:5 months
- Delivery:April 2012
FULL TURNKEY REFURBISH.
- From Design (IDEAS CONTEST)
- to Completion (CPI)
- Owner: AXA REIM
- Architect:Transparent Building Solutions
- 3.200 m²
- 2013